Installed water quality purification system - List of Manufacturers, Suppliers, Companies and Products | IPROS

Installed water quality purification system Product List

1~2 item / All 2 items

Displayed results

[Case Study of Water-Based Projects] Example 2: Purification of Golf Course Landscape Ponds

Collecting water from the top of the device (downward flow)! Discharging purified water from the central pump.

We would like to introduce a case study of an underwater purification system for water quality improvement in the "Golf Course Landscape Pond Purification" at Kyoga-no Golf Club. The purification aims to suppress the occurrence of algae. The total water surface area is 2,867 m², with an average water depth of 3 m, and one unit was installed. Since the facility is located at the bottom of the pond, it is not visible from outside and is aesthetically pleasing. Additionally, because it is installed at the bottom of the pond, it does not require land for facilities on land. 【Case Overview】 ■ Project Name: Kyoga-no Golf Club (Mie Prefecture) ■ Purification Purpose: Suppression of algae occurrence ■ Total Water Surface Area: 2,867 m² ■ Average Water Depth: 3 m ■ Number of Units Installed: 1 *For more details, please refer to the PDF document or feel free to contact us.

  • Septic tank equipment
  • Installed water quality purification system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Water-Based Projects] Example 3: Purification of Golf Course Landscape Ponds

No need for land for facilities! A structure that takes into account living organisms without involving fish.

We would like to introduce a case study of an underwater purification system for the "Golf Course Landscape Pond Purification" at Hitachidai Golf Club. This system is installed at the bottom of a pond with a water depth of 1.0m to 5.0m. Since the facility is located at the bottom of the pond, it is not visible from outside and is aesthetically pleasing. The purpose of purification is to suppress the occurrence of blue-green algae, and the total water surface area was approximately 23,661 m². 【Case Overview】 ■ Project Name: Hitachidai Golf Club (Ibaraki Prefecture) ■ Purification Purpose: Suppression of blue-green algae occurrence ■ Total Water Surface Area: Approximately 23,661 m² ■ Average Water Depth: 3m ■ Number of Units Installed: 3 *For more details, please refer to the PDF document or feel free to contact us.

  • Septic tank equipment
  • Installed water quality purification system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration